Cambrils is working on the preparation of the beaches for the tourist season
Cambrils. Costa Dorada. 30th May 2012. The town of Cambrils brigade is working on the preparation of over 8 kilometers of beach season. The work started on 16 May and is scheduled to end Friday. On the one hand, it has been cleaned with shovels and bulldozers leveling machine to remove debris that accumulate with storms and rain during the winter. Thus, the ground turns to leave with the suitable profile cribadores because the machines that have a mesh to purge the sand, there may come to do the maintenance during the summer. They also have recovered outputs and rainwater gullies. Meanwhile, a team of four people have been traveling around the coast to the manual cleaning and clearing of grasses the top of the beaches that is to get the jobs they can not do machines. In addition, on May 24 was added to the Ministry of Environment with rotary excavators, articulated trucks that carry special beach areas, to move the sand from the central part of Vilafortuny to Cape San Pedro, the limit to Salou. This section, between 500 and 600 meters, suffers much degradation in the winter and its width is reduced to a maximum of 8 or 10 feet, while the sand accumulates in the middle of Vilafortuny. With the movement of sand, which likely will end this Wednesday, the width is increased to 10 or 15 meters.
Tags: costa dorada,
cambrils,
painting,
sculpture,
exhibitions,
museums
REQUEST MORE INFORMATION BY EMAIL